Powered by FlowAI

The whole job. One set of figures.

From the first phone call to the last invoice. Price a job from what it costs you, and when they say yes the quote becomes the contract, the scope of works and everything you invoice against. Nothing gets retyped.

One project free, forever. No card needed.

The SiteScope dashboard, showing active projects, upcoming deadlines and recent activity
Why builders move

Most tools hold one piece of the job

A quoting app, a spreadsheet and an accounts package each keep their own copy of the numbers, and keeping the three agreed is a job in itself. SiteScope keeps one.

  1. 1

    Enquiry

    Somebody rings. Name, what they want, where they heard about you — thirty seconds.

  2. 2

    Quote

    Priced up from what the work costs you, with the margin visible as you type.

  3. 3

    Contract

    Accepted. The contract sum, the VAT rate and the scope of works write themselves.

  4. 4

    Variations

    Every change priced and agreed against that sum, so the total is never in doubt.

  5. 5

    Invoices

    Raised from the stages and changes already owed. Nothing typed twice.

  6. 6

    What it made

    Real costs against the quote's build-up. The number nobody usually has.

Change the price of one thing and it is right everywhere, because there is only one place it lives.

Built for how a job actually runs

Not a generic project tool with construction words pasted over it. The stages, the inspections, the CIS return and the defects period are the real ones.

Win the work

Every enquiry logged in thirty seconds while they're still on the phone, the site visit booked, and a report at the end of the year telling you which sources actually pay and why you lost the rest.

Price it from your costs

Build the price up from labour, materials, subbies and plant. SiteScope works out the charge — and shows you that 20% margin means adding 25%, not 20%.

The quote becomes the contract

They say yes and the job starts itself: contract sum, VAT rate and the full scope of works — including what's excluded — written from the quote you already sent.

Run it from site

Programme, photos, diary, snags and one thread per job. All of it one-handed on a phone, with an offline page for when the signal goes.

Get paid

Invoices raised from what the job already says is owed, numbered properly, frozen once issued, with the VAT worked out per line. Plus the export your accountant actually wants.

The paperwork that bites

Construction phase plan, RAMS, CIS deductions and returns, retention and the defects period. The parts that are quiet until they're expensive.

FlowAI

An assistant that has read the whole job

Pinned in the corner of every screen. Ask it what's late, who hasn't been rung back, what a job has cost against what you quoted, or when your CIS return is due — and it answers from your own records, not from the internet.

  • Reads the programme, the enquiries, the quotes, the costs and the diary
  • Makes changes on your say-so — and shows you the record first
  • Won't price a job, set a margin or decide a VAT rate. Those are yours
  • Comes with a monthly allowance, so it can never run up a bill
How FlowAI works
The FlowAI assistant open over a project timeline, answering a question about the job
Compliance

The paperwork that is quiet until it is expensive

CDM applies to every job, however small. CIS deductions come off the labour and not the invoice. A late monthly return is £100 the day after the 19th. SiteScope keeps the record and counts the days.

Safety on every plan

Construction phase plan, RAMS, toolbox talks and sign-offs — free tier included, because CDM duties do not scale with a subscription.

CIS done right

The deduction off the labour only, tax months that run 6th to 5th, and every subcontractor's statement as one PDF.

What SiteScope does and does not decide
Building control inspections and certificates filed against the job
How it works

Set up on Monday. Running by Tuesday.

Most builders have their first job on in under half an hour — and everyone they invite gets a short tour of their own screens the first time they sign in.

01

Log the enquiry, price the job

Take the call, book the visit, build the price up from your costs. Send a proper quotation that says whether it's a fixed price — and how long it holds for.

02

Run it from site

Accepting the quote starts the job with the contract and scope already set. Photos, diary entries and snags go in from a phone in the yard, and everyone sees the same programme.

03

Hand over and close it out

Sign off practical completion and the defects period starts, the retention falls due and the handover pack is a click. Defects the client reports come straight back to you.

Starting a new project: pick a template, or let FlowAI read your own proposal

Step two, as it actually looks.

What a client sees on their phone: progress, photos and what happens next
For your clients

The “any update?” text, answered before it's sent

Clients get their own view of their own job: progress, photos, the payment schedule, decisions waiting on them, and — after you finish — somewhere to report anything that isn't right. When something needs them, they hear about it by email too, so it doesn't wait for them to log in. They never see your costs, your margin, what you pay a subcontractor or your site diary.

What clients see
For your team

Everyone on the job, seeing what they should

Site managers, employees and subcontractors each get the access their role needs. A subcontractor can see the programme and the safety record but not what you charge, what you pay anybody else, or what the job is making. That line is drawn in the database, not hidden in the interface.

Roles that mean something

Owner, admin, employee, subcontractor and client — enforced by row level security on every table.

Built for a phone

Every screen works one-handed on site, with an offline page for when the signal goes.

A project timeline with stages, dates and completion
When you're stuck

Help, in the order that's quickest

FlowAI first — it has read the guides as well as your jobs — then the guides themselves, then a person, by email. No ticket number, no phone menu.

  1. 1

    Ask FlowAI

    In the app, the assistant in the bottom-right corner answers questions about your job and about SiteScope itself. It has read these guides too, and links the one it used. Included on Pro and Bespoke.

    How FlowAI works
  2. 2

    Search the guides

    Everything from signing up to handing over, and the common problems with their fixes. The search finds the paragraph, not just the page.

    Common problems, solved
  3. 3

    Email a person

    support.sitescope@kudu-digital.com — we reply within two working days. Say which company you're with and what you were doing; a screenshot helps.

    Email support

Start your first project today

The free plan runs one project end to end — no card, no trial clock. Move up when you're running more.

SiteScope — the whole job, from the first phone call to the last invoice · SiteScope